For the complete documentation index, see llms.txt. This page is also available as Markdown.

Error Handling

Show what failed and what the user can do next. Separate an unsent request, a pending transaction and a reverted receipt.

Common cases

Situation
Next action

Wrong network or deployment

Reconnect to the intended Pro network and configuration

Creation fee, economics or deployment version changed

Refresh the preview and rebuild within the user's accepted fee and launch limits

Insufficient balance or allowance

Check the asset and spender; confirm any approval before preparing again

Deadline expired or output below the limit

Refresh the quote and have the user review it; preserve agreed slippage limits

Curve closed

Read the lifecycle state and follow the pool-creation or recovery path

Unknown Partner ID

Correct the ID or explicitly choose no Partner

Partner frozen or wrong claim account

Refresh the Partner's status and current Recipient

Recipient or metadata updates permanently disabled

Explain that this permission cannot be restored

Wallet account or network changed

Recreate the client and prepare for the selected account and network

Decode the contract error with the matching ABI and explain the action the user can take.

Pending and failed transactions

send returns a transaction hash. Wait for a receipt with status === "success" before displaying completion. If waiting times out, resolve the existing hash or replacement before submitting again.

A revert rolls back that transaction's state changes, but the transaction can still consume network gas. A successful approval remains valid even if a later creation fails.

Successful partial trades

A closing curve buy can succeed, spend less than requested and refund the rest. Read its actual fill; do not automatically trade the refund. A successful buy can also leave the launch waiting for sweep or pool creation. See Graduation.

Creation and protection errors

Use the matching ABI to decode these errors.

Error
Next action

PoolProtectionHashMismatch

Stop submission. Read and show the current protection policy, including its Resolver and rules data, and review the selected protection days; have the user confirm the change before rebuilding and previewing the final request. Do not silently refresh the hash.

PoolTransferRestricted

Read the Token's current restriction and protection end state. Show which listed destination is blocked and when its restriction can end; pool-list membership alone does not mean a transfer is currently restricted.

ProtocolFeeRecipientConflict

Stop creation and ask the deployment operator to correct the protocol fee recipient configuration.

InvalidProtectionDays

Use an integer from 0 to 365, in days.

MinHoldingBelowFloor

Refresh the Holder minimum and review the new holding threshold.

Last updated

Was this helpful?